Commvault
Report Configuration - Commvault Command Center
- Carl Brault (Unlicensed)
- tdopko@commvault.com (Unlicensed)
Quick Links to Topics:
Commvault Command Center Reports
The Commvault Command CenterTM provides several reports to monitor the CommCell® environment. In addition to these, a wide variety of reports can be downloaded from Commvault® store providing monitoring, trend analysis, and various statistical information. This set of tools allows an organization to ensure the proper functioning of the environment, to control its growth, and to optimize its performances.
The Commvault Command CenterTM Reports view displays available reports grouped in categories for ease of navigation.
The reports view
1 - Click Reports.
2 - The number indicates reports requiring to be updated.
3 - Use the search for report by name.
4 - Run a report by clicking the icon.
Work with Charts
Any chart within a report can be printed or downloaded. The chart can also be maximized to full screen. To revert it back to its original size, simply click the Exit full screen button.
To work with charts
1 - Click Reports and select any report to open.
2 - Any chart can be maximized to full screen or downloaded. Move mouse to display additional setting for download and expand to full screen.
3 - Click on Gear to expand menu.
4 - Select Columns to add additional information to chart view.
5- Click on More Actions for expand menu to Save, Email, Schedule, Edit and Delete options.
Download Reports from Commvault® Store
If the desired report does not appear by default, it is possible to connect to the Commvault® Store to download and install additional reports in the Commvault Command CenterTM.
To download a report from the store
1 - Click Reports.
2 - Click on Actions to display drop-down list.
3 - Select Connect to store from the list.
4 - Provide credentials to log into cloud.Commvault.com then click Login button.
5 - Search for report or browse through sections.
6 - Download and install any report by clicking the Install button.
7 - Red dot indicates installed reports that need update.
8 - Turn switch on to automatically update install reports.
Schedule a report
The Commvault Command CenterTM reports can be scheduled to be sent as an attachment by email. This ensure that a backup Commvault® administrator receives all the required information to properly monitor the CommCell® environment.
To schedule a report
1 - Click Reports.
2 - Click on report icon to run the report.
3 - Click More actions, then Schedule.
4 - Provide a name for the scheduled report.
5 - Select from drop-down list an export format for the report.
6 - Select the users that will receive the report or type a SMTP email address of a non-registered user or group.
7 - A copy of the report can be saved to a network share.
8 - Define the frequency and time at which the report is executed.
Edit a Report Schedule
A report schedule can be run on demand. This allows the report to be sent by email immediately without having to wait for the next occurrence of the schedule to run. A scheduled report can also be modified or deleted.
To edit or delete a scheduled report
1 - Click Reports.
2 - Click on Actions to display list and select View schedules.
3 - Check the box to select the report.
4 - Once selected, a report can be enabled/disabled.
5 - A report schedule can be edited by clicking its name.
6 - A report schedule can be run on demand, edited or deleted.
Copyright © 2021 Commvault | All Rights Reserved.